Multi-location










It includes design, technical and economic feasibility analysis, procurement and supply of components, system installation, commissioning, and regulatory management with CFE (interconnection). Installation times depend on the size of the system, and interconnection times depend on the area where the process is carried out.
During our consultation process, Caliza will conduct a structural and electrical assessment to tailor the solution to the property's infrastructure, designing it in accordance with established local and international safety standards.
The cost of the project will depend on the size and specific characteristics of the energy system. However, the average payback period is 2 to 3 years for commercial and industrial projects.
Investments in an industrial battery energy storage system (BESS) combined with a renewable energy generation system (solar panels) may be 100% deductible in the first year under Article 34, Section XIII of the Income Tax Law. Likewise, we have different financing options adaptable to your specific needs.
Components come with manufacturer warranties, and Caliza includes performance and generation guarantees.
Our operation and maintenance policy includes both preventive maintenance, which is performed on a scheduled basis to prevent failures and ensure system performance, and corrective maintenance, which is carried out in the event of unforeseen failures or damage affecting system operation. Corrective maintenance is performed as soon as a failure is detected, with restoration prioritized.
Primarily energy cost reduction, accelerated achievement of sustainability (ESG) goals, and greater energy stability, quality, and self-sufficiency.
We offer several alternatives specialized in energy assets (PPAs and leasing) or traditional financing models, including bank credit options, as well as capital and operating leases.
